Home Products |
|
|
 |
Saboo Rotary kiln Cement plant is the name of
innovation, quality conscious, cost effective technology. We offer ROTARY
KILN Cement plants from 100 TPD to 900 TPD on turn key basis and have capabilities to
undertake all aspects of cement plant construction, including feasibility studies,
technical advice, equipment supply, field construction, supervisory services,
commissioning etc.
Enviornment Friendly
|
 |
 |
To prevent the dust
from escaping into the environment we have incorporated the highly efficient measures for
pollution control. Reverse pulse jet filters are installed at every material transfer
points. Flue gases from kiln are treated in an Electro static precipitator (ESP) for
cleaning before releasing into the atmosphere.
|
|
| |
Unique Features |
- High efficiency separator at raw mill.
- CFC silo for Raw Meal blending.
- Low pressure drop pre heaters.
- Pre calciner suitable for alternative fuels.
- Efficient seals at inlet & discharge.
- Better cooler design.
|
|
|
Benefits |
- Low Installed cost.
- Less Power Consumption.
- Ample fuel saving.
- Shorter gestation period.
- Easy in operation.
- Negligible Maintenance.
- Trouble free Technology.
|
|
|
|
|
|
| Process Flow Chart : |
|
| |
Manufacturing Process |
1. Crushing & Proportioning:
The main raw material is limestone, which is crushed and transported to the pre-blending
stockpile by means of a belt conveyor. After reclaiming it is stored into the respective
hoppers along with other Raw materials. These raw materials then extracted in desired
proportion with the help of electronic weigh feeder & transported to the raw mill for
fine grinding.
2. Raw milling & Blending:
The raw mill is a closed circuit ball mill equipped with high efficiency separator. After
grinding to 90 microns size the raw meal is send to the continuous blending silos (CFC)
for homogenization & extracted by means of load cell hopper for feeding to the kiln
pre heaters.
3. Pyro processing :
It consists of series of low-pressure drop, pre heater cyclones generally with fluidized
bed calciner, where the calcinations begin and material goes into the Rotary Kiln and
after clinkerization the hot material is sent to the cooler for its cooling. The cooler is
efficiently designed to recover maximize heat while cooling the hot clinker which is then
crushed & sent to the stock pile for intermediate storage.
4. Burning :
The required temperature for the clinkerisation is about 1500oC, which can be attained
either by Coal, Gas or Oil. The burner is fuel-efficient specially designed Multi channel
type for uniform burning.
5. Cement milling, Storage & Packing:
The clinker mixed with app. 5% of gypsum is sent to the cement mill (Ball Mill) for fine
grinding to produce cement. It is then transported to CFC silo for blending & storage
and is packed in the bags with helps of auto packers & transported to the market for
sale. |
| |
|
|
| |
|
|
| Plants Offered |
100 |
200 |
300 |
600 |
900 |
| Land (Sq. M) |
20,000 |
40,000 |
60,000 |
80,000 |
100,000 |
| Power (kw) |
1150 |
2200 |
3300 |
6000 |
8500 |
| Gestation Period |
10 -12 |
10 - 12 |
13 - 15 |
16 - 18 |
16 - 18 |
| |
| Raw Material (TPD) |
| Lime Stone |
150 |
300 |
450 |
900 |
1350 |
| Clay |
15 |
30 |
45 |
90 |
135 |
| Coal (4000 kcal/kg) |
20 |
40 |
60 |
120 |
180 |
| Gypsum |
5 |
10 |
15 |
30 |
45 |
| |
| Manpower (for 3 shift) |
| Administrative |
3 |
5 |
5 |
7 |
7 |
| Technical |
9 |
9 |
9 |
15 |
15 |
| Skilled Worker |
9 |
12 |
12 |
15 |
15 |
| Unskilled Worker |
21 |
24 |
24 |
36 |
36 |
| |
| Utilities |
| Power (KWH/T) |
100 - 100 |
100 - 110 |
100 - 110 |
90 - 100 |
80 - 90 |
| Fuel (kcal/kg) |
850 - 900 |
850 - 950 |
800 - 850 |
750 - 800 |
750 - 800 |
|
|
|
|
| |
|
Project Implementation
Schedule |
 |
|
| |