Home Products |
|
|
 |
In
some of the countries / arias, raw material like limestone is not available for
manufacturing cement, They can import clinker, which is available in large quantity, and
grind to produce cement. Clinker grinding plant is very simple. It comprises a feed
hopper, Precrusher, Table feeders, Ball mill, Blending, Packing Plant and Material
Handling equipment. Saboo offers clinker grinding plants from 50 TPD to 1000 TPD on turn
key basis.
. |
 |
| |
|
Salient Features |
·
Unique
Tire Mounted Mills.
·
Traditional Trunion Mounted Mills.
·
Economical.
·
Less Power consumption.
·
High Performance.
·
Minimum Maintenance.
·
Low cost of Production.
·
Robust construction. |
|
 |
| |
|
|
 |
|
MILL SHELL:-
Mill Shell is fabricated from tested quality of heavy duty Steel Plates; the shape of the
shell is maintained perfectly during the manufacturing. The holes for liners are drilled
with the help of template to ensure perfect distribution. The mill shell are welded with
x-ray quality welding. |
| |
|
|
Liners :-
These are the essential part of the mills and are designed to give optimum production.
High Carbon Steel, Cast Manganese Steel and Ni-hard liners are available as per
Customer specification.Diaphragm :-
Diaphragms assist in optimizing the level of material filling ratio in each chamber of
Ball Mills. Saboo has developed a unique diaphragm for controlling the flow of material
properly which ultimate result in high performance and maximum use of grinding energy of
the Mill. |
|
 |
| |
|
|
 |
|
DRIVE
UNIT:-
Consists of cast steel fine finish
Hob-cut girth gear and EN-19 pinion coupled with bright steel shaft housed in spherical
roller bearings.
Smaller mills up to 120 HP are driven with V-belt and pulleys and larger mills are
provided with helical gearboxes coupled with motor as shown in the picture. |
|
|
|
|
|
|
|
| |
| Process Flow Chart : |
| |
 |
| |
Manufacturing Process |
|
|
1) CRUSHING & STORAGE: -
The raw materials, Clinker and Gypsum are carried from stock yards by means of a
Pay loader and charged into a dump hopper fitted with a vibro feeder to control feed rate.
A belt conveyor handles material to Granulator for Crushing which is then stored with the
help of a Bucket elevator into the respective Silos/Hoppers. The crushed material is then
extracted by means of table feeders in the desired proportion and fed to the Ball Mill
hopper.
2. CEMENT MILLING:
The mix is handled by a Bucket Elevator and fed to the Ball mill hopper for intermediate
storage.where a mill feeder is installed, which controls the feed rate to mill, and
desired fineness can be adjusted. The Cement produced is stored into the Cement Silo and |
blended through
the aeration assemblies to ensure consistent and high quality Blended Cement.
3) PACKING: -
Cement is extracted from the Cement silo by means of a screw feeder and transported to
Packer Plant where it is first screened to remove any foreign particle and than stored
into a hopper for packing with the help of Auto Packers. Spillage if any during the
packing is collected into a spillage hopper and recycled to the system. The packed bags
are handled by a Belt conveyor and transported to Cement Godown for sale.
|
|
|
| |
Suitable Raw Materials |
| 1. |
Clinker |
: |
CaO 60% min. |
| 2. |
Gypsum |
: |
CaSO2.2H2O 75% min |
|
|
| |
|
|
| Plants Offered |
50 |
2 x 50 |
100 |
150 |
2 x 100 |
2 x 150 |
200 |
300 |
400 |
600 |
| Land (Sq. M) |
2000 |
4000 |
4000 |
6000 |
8000 |
10,000 |
8000 |
10,000 |
14,000 |
16,000 |
| Power (kw) |
100 |
200 |
200 |
300 |
400 |
600 |
400 |
600 |
800 |
1200 |
| Gestation Period |
4 - 5 |
4 - 5 |
6 - 8 |
6 - 8 |
6 - 8 |
6 - 8 |
9 -10 |
9 -10 |
9 -10 |
9 -10 |
| |
|
|
|
|
| Raw Material (TPD) |
|
|
|
|
| Clinker |
50.00 |
100.00 |
100.00 |
150.00 |
200.00 |
300.00 |
200.00 |
300.00 |
400.00 |
600.00 |
| Gypsum |
2.50 |
5.00 |
5.00 |
7.50 |
10.00 |
15.00 |
10.00 |
15.00 |
20.00 |
30.00 |
| |
|
|
|
|
| Manpower (for 3 shift) |
|
|
|
|
| Administrative |
2 |
2 |
2 |
3 |
3 |
3 |
3 |
5 |
5 |
5 |
| Technical |
3 |
3 |
3 |
6 |
6 |
9 |
6 |
9 |
9 |
9 |
| Skilled Worker |
4 |
4 |
4 |
6 |
6 |
9 |
6 |
9 |
12 |
12 |
| Semi - skilled |
18 |
18 |
18 |
18 |
21 |
21 |
21 |
24 |
24 |
24 |
| |
| Utilities |
| Power (kWh/T) |
30 - 35 |
| Water (lit/T) |
100 |
|
|
|
|
| |
|
Project Implementation
Schedule |
 |
|
|
| |
 |